The artists Lek & Sowat created a graffito for the cutterhead of the TBM of Line 14 Lot 4.
In this project, SWS is engaged as a designer in JV with EGIS. SWS is committed to the engineering studies and follow-up concerning the mechanized tunnelling, the construction of the RN7 circular shaft, and the monitoring plan of the construction works.
At the following link, the group NGE shared a video of the realisation of the graffito.