SWS engineering has developed an automatic system for the consolidation of the rocky substrate on which the infrastructure rests. An “internet of things” project, called T-Grout, that allows to inject cement into the base of the Mosul dam to fill the dangerous voids that have formed over the years; at the same time a software monitors the stability of the Middle Eastern infrastructure in real time from Trento (Italy).
Click here for more information.