Residence Tolbiac, Paris – Excavation phase completed!

The excavations have been completed in the area of the future residence Tolbiac, a project that sees SWS as designer of the retaining structures for Sicra company (Vinci Construction France).
The ambitious project includes the construction of three buildings of 8/9 floors with different underground floors, a few meters above of the existing metro tunnel of line 14. To be built has been demolished an existing building which was adjacent to two residential buildings and have been excavated about three levels from the ground.
The work of SWS team continues analysing and interpreting tunnel’s monitoring information of the line 14 to ensure the full operation until the completion of the residence structure.

 