The meeting with AFER was held last week at SWS’s Headquarters. SWS has shown its railway design capability with related systems.
In the days of the Technical Audit, the visit to the construction site of the Brenner Base Tunnel took place.
The report was completely positive and they have confirmed the AFER Certification!